CV
Ali Tayebi
Ostring 22
31241, Ilsede/Bülten
Germany
E-mail: contact@ali-tayebi.com
Mobile Phone: 0049-160-9387-8329

Professional info
I'm a mining and mineral processing engineer who spent most of his career time in different countries and in diverse range of technical roles, including mining and construction operations, project management, project coordinator, site supervisor, technical services, consultant, planning and design, process optimization, quality management, corporate and strategic planning, risk assessment, research and development.
Work experience
Associated Mining Construction UK Ltd (AMC UK), England
Site Engineering Lead/Project Coordinator/Engineering Systems Manager for Sirius Minerals York Potash Project
2017 - Present
Site works, temporary and permanent work design, planning, shaft lining and support, quality control, quality assurance, scheduling, method statements, risk assessments, trade-offs, design reports, tender documents, process development, document management
Redpath Mining Group in Europe (Deilmann-Haniel GmbH), Germany
Shaft Supervisor Engineer, Ust-Jaiwa Project, Russia
2016 - 2017
Site works, execution of shaft lining, shaft fittings and other installations
Mining Technology Consulting (MTC), Germany
Senior Designer/Consultant
2015 - 2016
Mine planning, design and optimization, production planning, equipment selection, quality management, economic evaluations, slope stability, scheduling, market studies, due-diligence studies, feasibility studies, design reports
Knauf Gips KG, Germany
Senior Mining Consultant
2013 - 2015
Mine planning, design and optimization, production planning, blasting optimization, equipment
selection, quality control, economic evaluations
Technical University of Clausthal, Germany
Project Manager/Engineer, Development Engineer
2009 - 2013
Mine planning, modelling, equipment selection, cost calculation, mineral processing, feasibility studies, stability analysis, quality control/management, process optimization, research proposal preparation, machine and method developments, market studies
Politecnico di Torino, Italy
Teaching Assistant (Tutor)
2006 - 2007
Mathematical analysis 1 and 2 for Iranian students
Lar Consulting Engineers, Iran
Supervisor Engineer
2001 - 2004
Consultant/supervisor/design engineer for mining, geotechnical and tunnelling projects
Tiv Kavan Maadan Ltd., Iran
Geotechnical Lead
2005 - 2006
“Acutum-Binzam” road design, Guinea
Ministry of Mining and Industrial Affairs/Iran Small Industries, Iran Internship
2004 - 2006
Worked as an intern on various Mineral Processing Projects
Education
Technical University of Clausthal, Germany
PhD - Mining/Asphalt Engineering, Summa cum Laude (Excellent)
2009 - 2015
Dissertation: Development of a new method for aggregate quality control in civil engineering applications (available online)
University of Tehran, Iran
MSc - Mineral Processing Engineering, GPA: 3.3/4.0
2004 - 2006
Thesis: Hydrometallurgical study of recovering zinc from heavy media tailings of “Calcimin” concentration plant, Iran
Tehran Azad University, Iran
BSc - Mining Engineering, GPA: 3.1/4.0
2009 - 2015
Politecnico di Torino, Italy
Karlsruhe Institute of Technology (KIT), Germany
BEng - Logistics Engineering
2006 - not completed
International School the Hague, Netherlands
Fajre Danesh School, Tehran, Iran
High School Diploma, Math-Physics
1997
Languages
English (Professional)
German (Advanced)
Italian (Intermediate)
Spanish (Elementary)
Arabic (Basic Knowledge)
Farsi (Native Speaker)
Professional Skills
Site Operations
Project Management
Mine Planning and Design
Open Pit Mining
Underground Mining
Shaft Sinking
Tunnelling
Asphalt Engineering
Mineral Processing
Hydrometallurgy
Flotation
Blasting
Geotechnics
Research and Development
Production Planning
Process Optimization
Equipment Selection
Statistical Data Analysis
Resource Estimation
Modelling
Rock Mechanics
Stability Analysis
Ground Freezing
Feasibility Studies
Due-Diligence Studies
Trade-off Studies
Tender Documents
Scheduling
Economic Assessment
Quality Management
Risk Assessment
Document Management
Lecturing
Personal Skills
Teamwork
Leadership
Coaching
Training
Motivator
Coordination
Time Management
Social Competence
PR-Competence
Intercultural Competence
Communication Skills
Multifunctional Team Leader Multidisciplinary Team Leader
Software Skills
Windows
Microsoft Office
Adobe Photoshop
Adobe Acrobat PRO
ACD See
AutoCAD
Microsoft Project
Surpac
Data Mine
Vulcan
Surfer
Slide
Geo-Slope
Mini Tab
Grapher
SPSS
Plaxis
Mining Calculator
OMEGA Pims
Certificates
International Blasting Certificate (Open Pit / Underground Excavations)
Surface Mining Technology
Successful Project Control
Atlas Copco Hydraulic - Breaker (Hammer)
Liebherr - Mining Equipment
Technical Drawing (1800 hr)
Exploration Drilling (30 hr)
Technical Services in Mines (30 hr)
AutoCad (130 hr)
Free Hand (35 hr)
Award
Wolfgang Helms Price, Technical University of Clausthal, 2015
Publications
H. Tudeshki, A. Tayebi and B. Lehmann, “Development of a new method for aggregate quality control in rock quarries,” in 23rd World Mining Congress (WMC), Montreal, Canada, August 2013
H. Tudeshki and A. Tayebi, “Development of a new method for quality control in the quarry industry for practicing sustainability,” in 5th Int. Conf. of Sustainable Development in the Mineral Industry (SDMI), Aachen, Germany, June 2011